Beel Kapalia is basically a marsh land or natural depression which lies in Monirampur upazila under Jessore district to the direction of south eastern from Dhaka. Mitigation of water-logging problem getting suspended sediment deposit gradually under a simulated manner is the driving mechanism for adapting Tidal River Management (TRM) project in the vicinity of the area. Besides, annual rainfall to the respective catchment area resulting flooding problem may be alleviated under proper disaster management program via introducing TRM as a selective approach. But, a lot of disputes and social movement have been arrived considering the demerits of TRM project including destruction of shrimp culture, which could be conducted by channelling the tidal water to marsh land, wetland ecosystem adversity, and assortment of an approximately 750 hectors marsh land and so on. This paper mainly focuses on the feasibility analysis of TRM project influencing to the local community. The field data is being collecting by pursuing social survey as questionnaire method to reveal the inherent perspective of the local people in this regard. Result show that about half of the people have been putting a negative attitude and rest of the sample having a mixed judgments regarding TRM project installation on the respective area. This paper provides an overview regarding the significant implication in an effort to introduce TRM project development in area studied and the finding could be helpful to pursue TRM project analysis in other area to be studied.
Published in | Hydrology (Volume 5, Issue 1) |
DOI | 10.11648/j.hyd.20170501.11 |
Page(s) | 1-6 |
Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
Copyright |
Copyright © The Author(s), 2017. Published by Science Publishing Group |
Tidal River Management, Water Logging Problem, Disaster Management
[1] | Rashid, F., 2010. Development of Eco-efficient Water Infrastructures in Bangladesh. In: Bangladesh Water Development Board, Third Regional Workshop on Development of Eco-efficient Infrastructures in Asia and the Pacific. Bangkok, Thailand (Accessed on 1 December, 2013). |
[2] | Sahrior, S., 2010. Tidal River Management: An Innovative Approach for Eradicating Drainage Congestion in Coastal Area, Dhaka, Bangladesh. |
[3] | Kabir, D. M. H., 2006. Water Logging in Southwest Coastal Region: A Case Study of Khulna Jessore Drainage Rehabilitation Project from People’s Perspective of Bangladesh, Volume 3, No 2. |
[4] | Kibria, Z., 2011. Tidal River Management: Climate Change Adaptation and Community Based River Basin Management and in Southwest Coastal Region of Bangladesh, Published by Uttaran, Dhaka, Bangladesh. Available at: http://www.internationalrivers.org/files/attached-files/uttaran_cimate_adaptation.pdf (Accessed on 11 April, 2013). |
[5] | Anon., 2011. Water Logging in Satkhira District: An Analysis of Gaps between Needs and Response. |
[6] | Khadim, F. K. et al., 2013. Integrated Water Resource Management (IWRM): Impact in South West Coastal Zone of Bangladesh and Fact-Finding on Tidal River Management (TRM). Journal of Water Resource and Protection, 5, 953-961, Available at: http://dx.doi.org/10.4236/jwarp.2013.510098 (Accessed on 11 April, 2013). |
[7] | EGIS, 1998. Environmental and Social Impact of Khulna Jessore Drainage Rehabilitation Project, Dhaka, Bangladesh. |
[8] | Die, L. D., 2013. Tidal River Management: Temporary Depoldering to Mitigate Drainage Congestion in the South West Delta of Bangladesh. M. Sc., Minor thesis. Netherlands, Wageningen University, (Accessed on 11 April, 2013). |
[9] | GoB, 2013. Yearbook of population statistics of Bangladesh 2013, Monirampur, Jessore, Bangladesh Bureau of Statistics, |
[10] | Wester, P., Bron, J. undated. Coping with water: Water Management in Flood Control and Drainage Systems in Bangladesh |
[11] | Ullah, W. M. and Rahman, R., 2002. Tidal River Management: A Sustainable Solution to Drainage Congestion in the Coastal Region in BAPA, Bangladesh Environment, Dhaka. |
[12] | Shampa and Pramanik, I. M., 2012. Tidal River Management (TRM) for Selected Coastal Area of Bangladesh to Mitigate Drainage Congestion, International Journal of Scientific and Technology Research, Volume 1, Issue 5, ISSN 2277-8616. |
[13] | Paul, A. et al., 2013. Tidal River Management (TRM) and its Implication in Disaster Management: A Geospatial Study on Hari- Teka River Basin, Jessore, Bangladesh, Volume 4, Issue 1, ISSN 0976-4380. Available at: http://www.ipublishing.co.inv/jggsarticles/volfour/EIJGGS4012.pdf. (Accessed on 28 November, 2014). |
[14] | Institute of Water Modeling (IWM), 2007. Monitoring the Effects of Beel Khuksia TRM: Basin and Dredging of Hari River for Drainage Improvement of Bhobodah Area, Dhaka, Bangladesh. |
[15] | Nandy, G., 2011. Entrapment: Food Security under IFI’s Intervention in Water Resource Management: A Case of pre and post KJDRP Situation. 1st ed. Bangladesh. IRV assisted by ACTIONAID Bangladesh and IFSN. |
[16] | Shuvo, M., 2013. Tidal River Management Project at beel Kapalia: Fear over Compensation Dissuades Farmer. The Daily Sun. 1th Dec. (Accessed on 5th December, 2013). |
[17] | Tutu, A. A., 2005. River Management in Bangladesh: A People’s Initiative to Solve Water-logging, International Institute for Environment and Development (IIED), London, No. 52. Available at: http://pubs.iied.org/pdfs/G02131.pdf. (Accessed on 1 December, 2013). |
APA Style
Rezaul Karim, Rakhee Mondal. (2017). Local Stakeholder Analysis of Tidal River Management (TRM) at Beel Kapalia and the Implication of TRM as a Disaster Management Approach. Hydrology, 5(1), 1-6. https://doi.org/10.11648/j.hyd.20170501.11
ACS Style
Rezaul Karim; Rakhee Mondal. Local Stakeholder Analysis of Tidal River Management (TRM) at Beel Kapalia and the Implication of TRM as a Disaster Management Approach. Hydrology. 2017, 5(1), 1-6. doi: 10.11648/j.hyd.20170501.11
AMA Style
Rezaul Karim, Rakhee Mondal. Local Stakeholder Analysis of Tidal River Management (TRM) at Beel Kapalia and the Implication of TRM as a Disaster Management Approach. Hydrology. 2017;5(1):1-6. doi: 10.11648/j.hyd.20170501.11
@article{10.11648/j.hyd.20170501.11, author = {Rezaul Karim and Rakhee Mondal}, title = {Local Stakeholder Analysis of Tidal River Management (TRM) at Beel Kapalia and the Implication of TRM as a Disaster Management Approach}, journal = {Hydrology}, volume = {5}, number = {1}, pages = {1-6}, doi = {10.11648/j.hyd.20170501.11}, url = {https://doi.org/10.11648/j.hyd.20170501.11}, eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.hyd.20170501.11}, abstract = {Beel Kapalia is basically a marsh land or natural depression which lies in Monirampur upazila under Jessore district to the direction of south eastern from Dhaka. Mitigation of water-logging problem getting suspended sediment deposit gradually under a simulated manner is the driving mechanism for adapting Tidal River Management (TRM) project in the vicinity of the area. Besides, annual rainfall to the respective catchment area resulting flooding problem may be alleviated under proper disaster management program via introducing TRM as a selective approach. But, a lot of disputes and social movement have been arrived considering the demerits of TRM project including destruction of shrimp culture, which could be conducted by channelling the tidal water to marsh land, wetland ecosystem adversity, and assortment of an approximately 750 hectors marsh land and so on. This paper mainly focuses on the feasibility analysis of TRM project influencing to the local community. The field data is being collecting by pursuing social survey as questionnaire method to reveal the inherent perspective of the local people in this regard. Result show that about half of the people have been putting a negative attitude and rest of the sample having a mixed judgments regarding TRM project installation on the respective area. This paper provides an overview regarding the significant implication in an effort to introduce TRM project development in area studied and the finding could be helpful to pursue TRM project analysis in other area to be studied.}, year = {2017} }
TY - JOUR T1 - Local Stakeholder Analysis of Tidal River Management (TRM) at Beel Kapalia and the Implication of TRM as a Disaster Management Approach AU - Rezaul Karim AU - Rakhee Mondal Y1 - 2017/02/24 PY - 2017 N1 - https://doi.org/10.11648/j.hyd.20170501.11 DO - 10.11648/j.hyd.20170501.11 T2 - Hydrology JF - Hydrology JO - Hydrology SP - 1 EP - 6 PB - Science Publishing Group SN - 2330-7617 UR - https://doi.org/10.11648/j.hyd.20170501.11 AB - Beel Kapalia is basically a marsh land or natural depression which lies in Monirampur upazila under Jessore district to the direction of south eastern from Dhaka. Mitigation of water-logging problem getting suspended sediment deposit gradually under a simulated manner is the driving mechanism for adapting Tidal River Management (TRM) project in the vicinity of the area. Besides, annual rainfall to the respective catchment area resulting flooding problem may be alleviated under proper disaster management program via introducing TRM as a selective approach. But, a lot of disputes and social movement have been arrived considering the demerits of TRM project including destruction of shrimp culture, which could be conducted by channelling the tidal water to marsh land, wetland ecosystem adversity, and assortment of an approximately 750 hectors marsh land and so on. This paper mainly focuses on the feasibility analysis of TRM project influencing to the local community. The field data is being collecting by pursuing social survey as questionnaire method to reveal the inherent perspective of the local people in this regard. Result show that about half of the people have been putting a negative attitude and rest of the sample having a mixed judgments regarding TRM project installation on the respective area. This paper provides an overview regarding the significant implication in an effort to introduce TRM project development in area studied and the finding could be helpful to pursue TRM project analysis in other area to be studied. VL - 5 IS - 1 ER -